Industrial / Buildings
- Electrical installations in the 390MW Power Plant of EKO, Thessaloniki
- Electrical works on TAP pipeline substations
- Electrical installations in the boiler upgrade of Units 3 & 4 of AHS Agios Dimitrios for NOx emissions reduction with primary measures
- Electrical installations in the Ptolemaida V Power Plant
- Installation of electrical equipment in the Thessaloniki Metro
- Construction and placement of electrical equipment in the flue gas desulfurization system of Unit 5 of Agios Dimitrios
- Electrical installations in the new wing of Bodosakeio hospital, Ptolemaida
Renewable Energy Sources
- Installation of electrical equipment in a 65MW Photovoltaic Station in Agios Christoforos, Kozani
- Electrical installation works in the interconnection of 35 MW Photovoltaic Stations in Kastoria
- Electrical equipment installation in the interconnection of Photovoltaic Stations in the Amyntaio Cluster
- Installation works in a 200 MW nominal capacity Photovoltaic Park at the Lignite Center of Western Macedonia
Mines
- Erection, supervision, and testing of the conveyor belts at the Amyntaio mine
- Replacement of 20KV & 6KV Medium Voltage Switchgear in the substations of the Southern Field mine
- Installation and maintenance of electrical equipment at the Southern Field mine
Substations
- Installation of Electrical Equipment in the GIS Substation 400kV/150kV/30kV Kymoundourou, Attica
- Auxiliary works at the 150/20kV Substation Kalamion, 150kV gate at the existing HVS Vouvainon and electrical works on the 150kV cable line of the aforementioned substations
- Auxiliary works in the installation and commissioning of a Controlled Synchronous Reactive Power Compensation System (STATCOM) with a capacity of 60 MVAR at the 150/20KV HVS Heraklion III